Anaheim Five Coves (Northern Extension) Park Project

3 Documents in Project

Summary

SCH Number
2016121076
Lead Agency
City of Anaheim
Document Title
Anaheim Five Coves (Northern Extension) Park Project
Document Type
NOD - Notice of Determination
Received
Posted
3/6/2017
Present Land Use
Z: Transition, unincorporated and multiple family residential/Water, open space, residential
Document Description
The City of Anaheim is proposing to develop a 9-acre linear urban nature park that would extend from Lincoln Street to Fontera Street. The proposed project is the second phase of the existing 14-acre Anaheim Coves Nature Park and is a continuation of that park's 1.5-mile multi-use trail and native-plant greening effort for the area. The urban nature park will include a .9- mile class 1 permeable asphalt bike path parallel to a stabilized decomposed granite multi-use trail. The park would also include a demonstration garden/children's education/nature play area and the installation of native vegetation and earthen swales for stormwater capture throughout the length of the park.

Contact Information

Name
Cristelle Erickson
Agency Name
CA Natural Resources Agency
Contact Types
Lead/Public Agency

Location

Cities
Anaheim
Counties
Orange
Cross Streets
Lincoln Ave and S Rio Vista St
Zip
92806
Total Acres
9
Parcel #
268-081-04, -03, etc
State Highways
91, 55, 57
Railways
Anaheim Regional Tran
Schools
Rio Vista ES, Sunkis
Waterways
Santa Ana River
Section
SanJoa

Notice of Determination

Approving Agency
CA Natural Resources Agency
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print