Pala Force Main
3 Documents in Project
Summary
SCH Number
2016121073
Lead Agency
Eastern Municipal Water District
(EMWD)
Document Title
Pala Force Main
Document Type
NOD - Notice of Determination
Received
Posted
4/25/2017
Document Description
EMWD is presently in the final design phase of its Pala Force Main project in the city of Temecular, Riverside county, CA. The Pala Force Main project would connect an existing wastewater force main near the Pujol Lift Station adjacent to 1st St near its intersection with Pujol Street to an existing wastewater force main near the Diaz Rd Lift Station adjacent to Diaz Rd approximately 1,000 ft south of Rancho Way, as shown on Figure ES-1. A portion of the proposed alignment would traverse approx. 230 feet across the parking lot of an apartment complex. To lessen the impacts to the residents of the apartment complex, the project proposes to utilize a trenchless method of construction across the parking lot.
The project would be constructed in two phases, aslo shown on Figure ES-1. Phase 1A would include approx. 4,600 lineal feet of 24-inch diameter force main from the connection point at 1st Street to Diaz Road. Phase 1B would include approx. 1,500 lineal feet of 18-inchd diameter force main along Diaz Road to the connection point near the Diaz Road Lift Station.
Contact Information
Name
Helen Stratton
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Temecula
Counties
Riverside
Cross Streets
Rancho California Rd and Diaz Rd
Zip
92590
State Highways
215, 79
Waterways
Murrieta Creek and Santa Margarita River
Base
SBBM
Notice of Determination
Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No