Imel Ranch Subdivision, Vesting Tentative Tract Map 3095
2 Documents in Project
Summary
SCH Number
2016121061
Lead Agency
City of San Luis Obispo
Document Title
Imel Ranch Subdivision, Vesting Tentative Tract Map 3095
Document Type
NOD - Notice of Determination
Received
Posted
2/27/2017
Present Land Use
Vacant residences and undeveloped land/R-1-SP;C/OS-SP/Low density residential (Orcutt area specific plan)
Document Description
Vesting tentative tract map within the Orcutt Area Specific Plan to create 23 lots including: 18 residential lots for the development of 18 single family residences; 2 drainage/detention basin lots; and 3 open space lots. Project would result in the disturbance of approx. 5 acres, including grading for tract improvements and building pads, and potentially an additional 1.5 acres of disturbance for off site improvements. Request includes mature tree removals, road design exceptions approved by the city public works department, structure height exception (5 feet), grading and restoration within locally-identified creek setback, and reduced rear yard setbacks.
Contact Information
Name
Shawna Scott
Agency Name
City of San Luis Obispo
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Orcutt Rd
Zip
93401
Total Acres
5.49
Parcel #
004-706-002
State Highways
227
Railways
UPRR
Airports
San Luis Obispo Regional
Schools
Hawthorne ES, SLOH
Waterways
Crotato Creek, Tanglewood Creek, Barrandca Creek
Township
31S
Range
12E
Section
1
Base
MDBM
Notice of Determination
Approving Agency
San Luis Obispo City Council
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes