LARC Ranch Water Pipeline Project
3 Documents in Project
Summary
SCH Number
2016121040
Lead Agency
Santa Clarita Water a Division of the Castaic Lake Water Agency
Document Title
LARC Ranch Water Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2017
Present Land Use
Residential 5 (H5), Community service, general commercial, and rurual land
Document Description
The proposed project would include the construction of a new 12-in ductile iron water transmission line by connecting to the nearest SCWD water line at Shadow Valley Lane and extending approximately 9,500 lf to a new service meter at the frontage of the LARC Ranch property. The width of the alignment would range from 30 in for the water pipeline trench to 20 ft for the temporary closure of the Bouquet Canyon Rd southbound. An on site booster pump station and 700 ft pipeline located on LARC grounds would connect to and fill the existing 0.36 MG storage tank from the new service meter. Discharge pipeline from the pump would extend approximately 30 ft to connect to an existing 8-in LARC pipeline that extends to the 0.36 MG tank. The pump station would be apx 10 ft high and less than 200 sf.
Contact Information
Name
Keith Abercrombie
Agency Name
Santa Clarita Water a Division of the Castaic Lake Water Agency
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Santa Clarita
Counties
Los Angeles
Cross Streets
Shadow Valley Ln and Bouquet Canyon Rd
Zip
91390
Total Acres
1
Parcel #
2813-013-028
Schools
Jo. S. Detention School
Waterways
Bouquet Creek
Notice of Determination
Approving Agency
Castaic Lake Water Agency
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No