Specific Plan Amendment (2016-1033) and General Plan Amendment (2016-1032), to the Historic Murrieta Specific Plan (SPM 8)

2 Documents in Project

Summary

SCH Number
2016121021
Lead Agency
Murrieta, City of (City of Murrieta)
Document Title
Specific Plan Amendment (2016-1033) and General Plan Amendment (2016-1032), to the Historic Murrieta Specific Plan (SPM 8)
Document Type
NOD - Notice of Determination
Received

Document Description
Proposed project consists of an amendment to the Historic Murrieta Specific Plan (SPM 8): Amending the text and development standards, the land use designations within the study area would be reconfigured to the following designations: Mixed-Use; Multi-Family; Public/Civic/Institutional; Rural Residential; Single Family-1; and Single Family-2. This would result in the potential addition of 1,151 dwelling units within the study area, and an estimated 1.229 million additional sq. ft. of non-residential uses. A corresponding amendment tot eh General Plan is proposed as a result of the changes to the land use map, text, and land use designations within the Specific Plan.

Contact Information
Paul Swancott
City of Murrieta
1 Town Square
Murrieta, CA 92562

951-461-6063

Location

Coordinates
33°33'14.9"N 117°12'50.8"W
Cities
Murrieta
Counties
Riverside
Cross Streets
Bound by Kalmia St, Ivy St, Jefferson Ave, Hayes Ave
Zip
92562
Total Acres
320
Parcel #
various
State Highways
15, 215
Schools
4
Waterways
Murrieta Creek

Notice of Determination

Approving Agency
City of Murrieta
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
1 Town Square, Murrieta, CA 92562

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search