TransCanada North Baja Pipeline - Milpitas Wash Project

Summary

SCH Number
2016118178
Public Agency
Colorado River Board
Document Title
TransCanada North Baja Pipeline - Milpitas Wash Project
Document Type
NOE - Notice of Exemption
Received
Posted
11/14/2016
Document Description
The North Baja Pipeline - Milpitas Wash Project involves the replacement of an approximately 260 foot long segment of 30 inch natural gas pipeline in the Milpitas Wash. Approximately 35 feet of the pipeline has been exposed and approximately 20 feet is suspended along the northeastern bank of the Milpitas Wash due to scour and lateral break erosion following an August 2014 storm event. TransCanada is required to operate and maintain its natural gas pipelines in order to ensure the safe and constant supply of natural gas to the public. This requirement is detailed in the U.S. Department of Transportation regulations codified in the Code of Federal Regulations, Tile 49, Part 192. The beneficiaries of the project are the public and TransCanada.

Contact Information

Name
Kai Dunn
Agency Name
Colorado River Board
Contact Types
Lead/Public Agency

Location

Counties
Imperial

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15301
Reasons for Exemption
The proposed project is statutorily exempt from the CEQA Act in accordance with CCR, Title 14, Section 15282 (k) because the project includes the repair of an existing pipeline.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print