Oak Vista Subdivision Project (Lake or Streambed Alteration Agreement No. 1600-2017-0224-R2)

3 Documents in Project

Summary

SCH Number
2016112049
Lead Agency
Rocklin, City of (City of Rocklin)
Document Title
Oak Vista Subdivision Project (Lake or Streambed Alteration Agreement No. 1600-2017-0224-R2)
Document Type
NOD - Notice of Determination
Received
Posted
3/12/2018
Present Land Use
4 single family rural residences/unclassified/medium density residential

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0224-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Equity Smart Investments, L.P. Project is limited to mass grading of the 14.4-acre project site and installation of an 18-inch culvert pipe that will connect to existing 18-inch pipes which currently outlet into the northern portion of the site and inlet in the southern portion of the site. Prior to pipe installation, all vegetation will be removed from the existing stream and emergent wetland. Following vegetation removal, the connecting pipe will be installed and covered with compacted native soil.

Contact Information
Gabriele Quillman
CDFW
1701 NImbus Road
Rancho Cordova, CA 95670

Phone : (916) 358-2955

Location

Coordinates
38°48'18"N 121°11'51"W
Cities
Rocklin
Counties
Placer
Cross Streets
Dias Lane/Makabe Lane/Whitehorn Dr/Mesquite Way/Black Willow Dr
Zip
95677
Total Acres
14.3+/-
Parcel #
045-043-009-030, 031, 032, 052
State Highways
I 80
Railways
UPRR
Schools
Sierra College
Waterways
Secret Ravine

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
1701 Nimbus Road, Rancho Cordova, CA 95670

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search