Pure Water Soquel: Porter Street Bridge Crossing (Lake or Streambed Alteration Agreement No. EPIMS-SCR-32421-R3)

16 Documents in Project

Summary

SCH Number
2016112045
Lead Agency
Soquel Creek Water District
Document Title
Pure Water Soquel: Porter Street Bridge Crossing (Lake or Streambed Alteration Agreement No. EPIMS-SCR-32421-R3)
Document Type
NOD - Notice of Determination
Received
Posted
4/27/2023
Document Description
The project is limited to the installation of a conveyance pipeline crossing at Porter Street Bridge as part of the Pure Water Soquel Groundwater Replenishment and Seawater Intrusion Prevention (PWS) project. The project requires earthwork and trenching at two locations (north and south side) to connect the bridge mounted pipeline segment to the below-grade (in-road) pipeline segments on either side of the bridge. Ground disturbance will result in 0.028 acre of temporary impacts to the stream bank. Use of the slurry mixture will result in 0.001 acre of permanent impacts. No trees will be removed.

Contact Information

Name
Serena Stumpf, Environmental Scientist
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Porter Street Bridge, in the County of Santa Cruz
Counties
Santa Cruz
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located at Soquel Creek, a tributary to the Pacific Ocean, accessed from the Porter Street Bridge, in the County of Santa Cruz, State of California; Latitude 36.98483, Longitude -121.95745.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Cruz
Final Environmental Document Available at
CDFW 2825 Cordelia Road, Suite 100 Fairfield, CA, 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.