Main Prairie Water District Pump Station 1 Project (Streambed Alteration Agreement No. 1600-2017-00144-R3)

7 Documents in Project

Summary

SCH Number
2016112030
Lead Agency
Maine Prairie Water District
Document Title
Main Prairie Water District Pump Station 1 Project (Streambed Alteration Agreement No. 1600-2017-00144-R3)
Document Type
NOD - Notice of Determination
Received
Posted
2/14/2019
Present Land Use
Agricultural with much of the district listed as prime agricultural
Document Description
The project would construct two new pump stations:PS1, at the NW Corner of the Intersection of Highway 113 and Fry Road, and PS2 at the SE Corner of Brown Road Crossing of Ulatis Creek Project element would include: -installation and operation of ps1, a pump station with 760 sf footprint and 30 cfs conveyance capacity, discharging into an existing canal to the north, including a temporary coffer dam -installation and operation of ps2, a pump station with a 4060 sf footprint and a capacity varying up to 96 cfs, including a temporary coffer dam - installation of an initial 1.5 mile 48-inch pipeline for water conveyance from ps2 of 64 cfs -installation of a parallel 36-inch pipeline from ps2 when needed in the future with a capacity of 32 cfs. -installation and operation of fish screens at ps2 to prevent entrapment of fish - installation of power lines to supply energy to pump stations. The purpose of the Project is to enhance the District's ability to distribute water throughout the District, and to improve water delivery and access on District agricultural lands.

Contact Information

Name
Don Holdener
Agency Name
Maine Prairie Water District
Contact Types
Lead/Public Agency

Location

Cities
Dixon
Counties
Solano
Cross Streets
Ulatis Creek - NW Cor Fry Rd & Highway 113 to SE Cor Brown Rd @ Ulatis Creek
Zip
95620
State Highways
113
Waterways
Pump Stations within Ulatis Creek

Notice of Determination

Approving Agency
Maine Prairie Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print