Maine Prairie Water District - Ulatis Creek Pump Stations
7 Documents in Project
Summary
SCH Number
2016112030
Lead Agency
Maine Prairie Water District
Document Title
Maine Prairie Water District - Ulatis Creek Pump Stations
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Agricultural with much of the district listed as prime agricultural
Document Description
The project would construct two new pump stations: PSI, at the NW Corner of the intersection of Highway 113 and Fry Road, and PS2 at the SE Corner of the Brown Road crossing of Ulatis Creek. Project elements would include: installation and operation of PS1, a pump station with a 760 sf footprint and 30 cubic feet per second conveyance capacity, discharging into an existing canal to the north, including a temporary coffer dam; installation and operation of PS2, a pump station with a 4060 sf footprint and a capacity varying up to 96 cfs, including a temporary coffer dam; installation of an initial 1.5 mile 48-in pipeline for water conveyance from PS2 of 64 cfs; installation of a parallel 36-in pipeline from PS2 when needed in the future with a capacity of 32 cfs; installation and operation of fish screens at PS2 to prevent entrapment of fish; and installation of power lines to supply energy to pump stations.
Contact Information
Name
Don Holdener
Agency Name
Maine Prairie Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Dixon
Counties
Solano
Cross Streets
Ulatis Creek - NW Cor Fry Rd & Highway 113 to SE Cor Brown Rd @ Ulatis Creek
Zip
95620
State Highways
113
Waterways
Pump Stations within Ulatis Creek
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), Department of Water Resources, Resources Agency, State Water Resources Control Board, Divison of Financial Assistance, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Central Valley Flood Protection Board
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Central Valley Flood Protection Board
Development Types
Other (2 Ea. Irrig. pump stations & construction of 2 pipelines)
Local Actions
permit - Rd Xng
Project Issues
Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Hydrology/Water Quality, Noise, Public Services, Vegetation, Wetland/Riparian
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.