Sasso Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0377-R1)

105 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Sasso Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0377-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/23/2019

Document Description
The project is limited to three (3) encroachments (Table 1) for work on stream crossings. Two proposed encroachments are to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. One (1) proposed encroachment is to decommission a stream crossing by removing approximately 1-2 cubic yards of fill in the stream channel and to implement stream restoration through native revegetation. The Notification also discloses the use of a well located at Lat./Long.: 39.4455, -123.2077. This well is presented as the sole source of water for all needs on the property. CDFW did not evaluate hydraulic connection of the well to surface water, nor was a hydrogeologic evaluation prepared by a licensed geologist provided for CDFW review. No other projects that may be subject to FGC1602 were disclosed. This Agreement does not retroactively permit any stream crossings, water diversions or other encroachments not described above.

Contact Information
Cheri Sanville
Department of Fish and Wildlife Northern Region
619 Second Street
Eureka, CA 95501

Phone : (707) 441-5901

Location

Coordinates
39.4452°'"N 123.20910°'"W
Cities
Willits
Counties
Mendocino
Parcel #
108-192-05
Township
18N
Range
12W
Section
5
Base
MDB&M
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 8 miles east northeast of the town of Willits, County of Mendocino, State of California. In the Foster Mountain U.S. Geological Survey 7.5-minute quadrangle.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
Available to the general public at the office location listed above for the Lead Agency. CDFW's record related to the Lake or Streambed Alteration Agreement available to the public for review at CDFW's regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2016112028_1600-2018-0377-R1_MEN_MJ Sasso Foster Mtn Pharms Water Diversion_NOD   PDF 709 K
Download CSV New Search