MJ COLUMBO LIONS DEN FAMILY FARMS STREAM CROSSING AND WELL (Lake or Streambed Alteration Agreement No. 1600-2019-0119-R1)

371 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
MJ COLUMBO LIONS DEN FAMILY FARMS STREAM CROSSING AND WELL (Lake or Streambed Alteration Agreement No. 1600-2019-0119-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/9/2019
Document Description
The project is limited to 4 encroachments (Table 1). The proposed scope of work comprises two separate stream crossing projects that need work and two existing low water crossings. The two 12-inch diameter culverts are undersized and non-functional or not installed correctly and will need to be replaced. The Notification describes STX-1 as non-functional due to sediment plugging and the outlet completely buried. STX-2 is not aligned with the stream grade. Both culverts will be replaced with a minimum of 18-inch diameter culverts sized to carry 100-year flows. Both projects are located on seasonal streams that are tributaries to Little Rock Creek. The existing low water crossings will be monitored and maintained to ensure the stream is not diverted down the road and sediment is not delivered to the stream. *See NOD for full details*

Contact Information

Name
Cheri Sanville
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Mendocino
Other Location Info
The projects are located in the Eel River watershed, in the County of Mendocino, State of California; Latitude 39.63586, Longitude -123.55693, 7270 Branscomb Road, Laytonville, CA 95454. Assessor's Parcel Number (APN) 014-040-16

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print