Boulle Stream Bank Stabilization Project (Lake or Streambed Alteration Agreement No. 1600-2016-0568- R1)

78 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Boulle Stream Bank Stabilization Project (Lake or Streambed Alteration Agreement No. 1600-2016-0568- R1)
Document Type
NOD - Notice of Determination
Received
Posted
5/31/2019

Document Description
The project is limited to one (1) encroachment. The encroachment is for stabilization of approximately 100 feet of eroding stream bank, using bioengineering techniques. Rock that was temporarily placed will be removed and staged. A series of rock and brush layer lifts, and a series of live willow siltation baffles will be constructed. In addition, a coir fabric-wrapped soil wedge pinned down with live willow stakes will be constructed and seeded, and trees will be planted at the top of bank. Trees and other plants will be irrigated until established. The notification also disclosed an existing, appropriately-sized stream crossing culvert, and the use of a well as the water source for the property.

Contact Information
Angela Liebenberg
Department of Fish and Wildlife Northern Region
619 Second Street
Eureka, CA 95501

Phone : (707) 964-4830

Location

Cities
Laytonville
Counties
Mendocino
Other Location Info
The project to be completed is located within the South Fork Eel River watershed, approximately 1 mile southwest of the town of Laytonville, County of Mendocino, State of California. The project is located in Section 13, T21N, R15W, Mt. Diablo Base and Meridian; in the Laytonville U.S. Geological Survey 7.5-minute quadrangle.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
County of Mendocino 860 N. Bush Street Ukiah, CA 95482

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2016112028_1600-2016-0568-R1_MEN_Boulle_BankStabilization_CahtoCk_NOD   PDF 551 K