Harris Mill Creek Meadows Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0744-R1)

49 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Harris Mill Creek Meadows Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0744-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
The project consists of three encroachments. The three proposed encroachments are to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. The Notification discloses three separate wells, only one of which is in use for irrigation and domestic water. The well in use (well #3) is 180 feet deep, draws water from 65 feet and has an estimated pump rate for 60 gpm. The notification discloses a small rainwater catchment pond that is for recreation use and currently not connected to any nearby stream. Applicant plans to rock armor and mulch/seed pond outlet to reduce erosion and prevent outflow connection to nearby streams.

Contact Information
John Herrera
CDFW
619 Second Street
Eureka, CA 95501

707.962.9044

Location

Coordinates
39.001368°'"N 123.351323°'"W
Cities
Booneville
Counties
Mendocino
Cross Streets
17300 Booneville Rd.,
Zip
95145
Parcel #
029-160-42; 029-160-52
Waterways
Navarro River
Township
15N
Range
15W
Section
26
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 2nd Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search