Marcus Water Diversions, Stream Crossings, Stream Restoration, and Pond Spillway Project. Lake or Streambed Alteration Agreement No. 1600-2019-0108-R1
383 Documents in Project
Summary
SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Marcus Water Diversions, Stream Crossings, Stream Restoration, and Pond Spillway Project. Lake or Streambed Alteration Agreement No. 1600-2019-0108-R1
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2023
Document Description
The California Department of Fish and Wildlife has executed Lake or Streambed Alteration Agreement number 1600-2019-0108-R1, pursuant to Section 1602 of the Fish and Game Code to Stuart Marcus. The project is limited to twelve (12) encroachments. Three (3) encroachments are water diversions. Two are direct diversions from South Fork Big River and the third is from an unnamed tributary to South Fork Big River. Water is diverted for domestic use and irrigation. Work for the water diversions will include 1) installation of diversion infrastructure consistent with this Agreement and 2) use and maintenance of the water diversion infrastructure. Six (6) proposed encroachments (Crossings 1, 4, 5, 6, 7, and 9) are to upgrade stream crossing culverts. Work for these encroachments will include excavation, removal of the existing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. One (1) proposed encroachment (Crossing 2) is to decommission a stream crossing and restore the stream channel. Work for these encroachments will include excavation, removal of fill and culvert, recontouring the channel to its original cross-section and profile, stabilizing fill in upland areas (or removal from the property), installing stream grade control, stabilizing exposed soils, and installing adequate erosion control. One (1) proposed encroachment (Crossing 8) is to install a secondary rocked ford and spillway to increase an onstream pond’s capacity to withstand 100-year flows. Work for the rocked ford and spillway encroachments will involve excavation, rock armoring slopes, placement of rock in the stream to mimic the natural channel, and rock armoring of crossings and approaches as necessary to minimize erosion. One (1) proposed encroachment (Greenhouse Removal) is to restore a stream channel by removing a greenhouse, raised planting beds, and imported soil from within an existing on-stream pond that no longer impounds water. A culvert located under the footprint of the greenhouse will be fully removed. After removing the culvert under the greenhouse, the fill will be contoured to a minimum 2:1 slope and the exposed fill shall be stabilized and revegetated. Work for this encroachment includes excavation, removal of fill and culverts, recontouring the channel to its original cross-section and profile, stabilizing fill in upland areas (or removal from the property), installing stream grade control, stabilizing exposed soils, and installing adequate erosion control.
Contact Information
Name
John Herrera
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Coordinates
Cities
Ukiah
Counties
Mendocino
Regions
Northern California
Cross Streets
approximately 15 miles northwest of the city of Ukiah
Parcel #
149-070-08; 149-070-09; 149-070-12; 149-070-14; 149-070- 17
Waterways
Big River watershed
Township
16N
Range
14W
Section
19
Base
MtDiablo
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Mendocino
Final Environmental Document Available at
County of Mendocino
860 N. Bush Street
Ukiah, CA 95482
Contact: Julia Acker
Phone: 707-234-6650
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.