Fresquet Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0472-R1)

50 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Fresquet Water Diversion and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0472-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
The project consists of three encroachments. One proposed encroachment is to upgrade and existing low water crossing. Work for this encroachment will include rock fortification of both road approaches, addition of 1.5-2inch well graded aggregated in the channel to increase shear strength and fill voids in existing placed rock. The other proposed encroachment is to upgrade a failing an undersized culvert. Work for this encroachment will include excavation, removal of the failing culvert, replacement with new properly sized culvert, back filling and compaction of fill, for domestic purpose. The Notification initially disclosed the intent to develop a new point of diversion and a storage reservoir to support irrigation of cannabis, however the applicant has decided to pursue a ground water well neat the existing cultivation area instead.

Contact Information
John Herrera
CDFW
619 Second Street
Eureka, CA 95501

707.962.9044

Location

Coordinates
39.001368°'"N 123.351323°'"W
Cities
Booneville
Counties
Mendocino
Cross Streets
17300 Booneville Rd.,
Zip
95145
Parcel #
029-160-42; 029-160-52
Waterways
Shake Creek
Township
20N
Range
11W
Section
18
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 2nd Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search