Jespon Pond Filling and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0878-R1)

64 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Jespon Pond Filling and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2017-0878-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
The project consists of two encroachments(s): One ecnroachment will decommission and fill a pond that was built without permits within the floodplain of Tenmile Creek. Work for this project will include take place in stages. The pond will be divided into 1/5th sections and 20% of the volume will be filled at a time. Each fill step will pccur on different days for a total of five days. Native fill material will be used to fill the pond and is supplied by the local countey yard. All work will occur when pond is dry. The one other proposed encroachment is to upgrade an undersized culvert. Work for this encroachment will include axcavation, removaling of th failing culvert, replacement with new properly sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information
John Herrera
CDFW
Northern region 619 Second Street
Eureka, CA 95501

707-441-5842

Location

Coordinates
39.278816°'"N 123.725527°'"W
Cities
Booneville
Counties
Mendocino
Cross Streets
40500 Comptche Ukiah Road
Zip
95460
Parcel #
121-210-31
Waterways
Tenmile Creek
Township
21N
Range
5
Section
24
Base
MDB&M
Other Information
1.9 south of Town of Laytonville;

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 Second Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No