Keats Crossings and Ponds Project (Lake or Streambed Alteration Agreement No. 1600-2018-0147-R1)
381 Documents in Project
Summary
SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Keats Crossings and Ponds Project (Lake or Streambed Alteration Agreement No. 1600-2018-0147-R1)
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2018
Present Land Use
rural residential, agriculture, resource management/All/All
Document Description
The project is limited to 5 encroachments. One encroachment is for a historic stock pond used for suppression and emergency water. A second encroachment is for a newly constructed rainwater catchment pond used for cannabis cultivation. A third encroachment is to maintain an appropriately sized functioning 36 inch culvert on a class II watercourse. A fourth encroachment is to maintain an appropriately sized and functioning 30 inch culvert on class III watercourse. A fifth encroachment is to maintain an appropriately sized and functioning 36 inch culvert on class III watercourse. The Permittee has disclosed a permitted water well and two ditch relief culverts. Work will include use and maintenance of the infrastructure.
Contact Information
Name
Timothy Smith
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Ukiah, Willits
Counties
Mendocino
Cross Streets
Unincorporated area, county wide
Parcel #
035-150-25-00
Waterways
Eel River
Township
21N
Range
14W
Section
18
Base
MDB&M
Other Location Info
Leggett
Other Information
Laytonville
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.