Salinas Water Diversion and Culvert Replacements (Lake or Streambed Alteration Agreement No. EPIMS-MEN-08843-R1)

371 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Salinas Water Diversion and Culvert Replacements (Lake or Streambed Alteration Agreement No. EPIMS-MEN-08843-R1)
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2021
Document Description
The project is limited to 4 encroachments: one encroachment is for water diversion from unnamed tributaries to the East Fork Russian River. Water is diverted with an onstream reservoir for irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure, including any bypass infrastructure. The 3 other proposed encroachments are to upgrade undersized and non-functioning stream crossings. Work for these encroachments will include excavation, removal of the existing crossings, replacement with new properly sized crossings, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
Kevin Joe
Agency Name
CDFW
Contact Types
Responsible Agency

Location

Cities
Potter Valley
Counties
Mendocino
Regions
Northern California
Parcel #
172-180-24; 172-170-12; 172-170-11
Other Location Info
The project is located within the Burright Creek-East Fork Russian River watershed, approximately 3 miles NW of the town of Potter Valley, County of Mendocino, State of California; Section 1, T17N, R12W, Mt. Diablo Base and Meridian, in the Redwood Valley U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Numbers (APN) 172-180-24, 172-170-12, 172-170-11; latitude 39.3586 N and longitude – 123.1394 W at the point of diversion (POD).

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Mendocino
Final Environmental Document Available at
County of Mendocino 860 N. Bush Street Ukiah, CA 95482

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print