Ryk Stream Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-MEN-05481-R1)

384 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Ryk Stream Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-MEN-05481-R1)
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2021
Document Description
The project is limited to one encroachment. The one proposed encroachment is to upgrade an undersized stream crossing. Work for this encroachment will include excavation, removal of the failing crossing, replacement with a new properly sized crossing, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. Replace the undersized 12" diameter culvert with minimum 36" diameter culvert.

Contact Information

Name
Cheri Sanville
Agency Name
CDFW
Contact Types
Responsible Agency

Location

Cities
Covelo
Counties
Mendocino
Regions
Northern California
Parcel #
032-291-03
Other Location Info
The project is located within the Eel River watershed, approximately 9.2 miles Northeast of the town of Covelo, County of Mendocino, State of California; Section 27, T23N, R11W, Mt. Diablo Base and Meridian, in the Newhouse Ridge U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 032-291-03; latitude 39.8201 N and longitude , -123.0785 W at the point of the first stream crossing.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Mendocino
Final Environmental Document Available at
County of Mendocino 860 N. Bush Street Ukiah, CA 95482

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print