Croft Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2019-0661-R1)

381 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Croft Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2019-0661-R1)
Document Type
NOD - Notice of Determination
Received
Posted
11/12/2020
Document Description
The project is limited to five (5) encroachments. Three (3) encroachments are to upgrade undersized culverts. One (1) encroachment is for replacement of the outlet of an existing pond. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. One (1) encroachment is for maintenance of an existing stream crossing culvert and installation of a rock apron at the outlet.

Contact Information

Name
Angela Liebenberg
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Michael Croft
Contact Types
Project Applicant

Location

Cities
Navarro
Counties
Mendocino
Regions
Northern California
Other Location Info
The project to be completed is located within the Navarro River watershed, approximately 4 miles southeast of the town of Navarro, County of Mendocino, State of California. The project is located in Section 26, T15N, R15W, Mt. Diablo Base and Meridian; in the Bailey Ridge U.S. Geological Survey 7.5-minute quadrangle.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print