Lipinski Stream Crossing and Remediation Project (Lake or Streambed Alteration Agreement No. 1600-2019- 0982-R1)

381 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Lipinski Stream Crossing and Remediation Project (Lake or Streambed Alteration Agreement No. 1600-2019- 0982-R1)
Document Type
NOD - Notice of Determination
Received
Posted
10/8/2020
Document Description
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement number 1600-2019-0982-R1, pursuant to Section 1602 of the Fish and Game Code to Mr. Skyler Lipinski. The project is limited to four (4) encroachments. Encroachment 1 (Crossing 1) is for maintenance of an existing 18-inch diameter culvert which outlets to a stream. Work for this encroachment will include removal of accumulated sediment and debris in and adjacent to the culvert. In addition, road improvements will hydrologically disconnect the road from the stream. Encroachment 2 (Crossing 2) is to remove an undersized 12-inch diameter culvert and associated fill on an unused road. Work for this encroachment will include excavation, removal of the existing culvert, recontouring the stream channel, and placing appropriate and adequate erosion control. Encroachment 3 is to remove a structure, all associated development, potting soil and sediment from a stream, and for placement of erosion control measures. Encroachment 4 is to remove unstable perched fill, and stabilize slope with adequate and appropriate erosion control measures.

Contact Information

Name
Angela Liebenberg
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Mendocino
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 6 miles northwest of the town of Leggett, County of Mendocino, State of California. The project is located in Section 4, T24N, R17W, Mt. Diablo Base and Meridian; in the Noble Butte U.S. Geological Survey 7.5-minute quadrangle, and Section 5, T24N, R17W, Mt. Diablo Base and Meridian; in the Piercy U.S. Geological Survey 7.5-minute quadrangle.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print