Cassidy Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2019-0693-R1)
216 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016112028
- Lead Agency
- Mendocino County
- Document Title
- Cassidy Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600-2019-0693-R1)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/1/2020
- Document Description
- The project is limited to 1 encroachment. The encroachment is to upgrade a failing and undersized 42" diameter culvert with a minimum 60" diameter culvert. Work will include excavation, removal of the failing culvert, replacement with new property sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
- Contact Information
-
Cheri Sanville
Department of Fish and Wildlife Northern Region
619 Second Street
Eureka, CA 95501
Phone : (707) 441-5900
Location
- Counties
- Mendocino
- Other Location Info
- The project to be completed is located within the South Fork Eel River watershed, approximately 10.4 miles north of the town of Laytonville, County of Mendocino, State of California. The project is located in Section 15, T23N, R15W, Mount Diablo Base and Meridian; in the Tan Oak Park U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number (APN) 056-180-09. The well associated with this project is located on APN 056-180-10, latitude 39.835281 and longitude -123.514326 W at the point of the first stream crossing.
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Available to the general public at the office location listed above for the Lead Agency. CDFW’s record related to the Lake or Streambed Alteration Agreement is available to the public for review at CDFW’s regional office.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Notice of Determination
- 2016112028_1600-2019-0693-R1_MEN_MJ Cassidy_Stream Crossing_NOD PDF 158 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.