Friedman Water Diversion and Crossings Project (Lake or Streambed Alteration Agreement No. EPIMS-MEN-02998-R1)

384 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Friedman Water Diversion and Crossings Project (Lake or Streambed Alteration Agreement No. EPIMS-MEN-02998-R1)
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2020
Document Description
The project is limited to five encroachments. One encroachment is for water diversion from unnamed tributaries to Tenmile Creek. Water is diverted for domestic use and irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure. Another encroachment is to remove a cultivation area within stream setbacks and restore the area. The Permittee shall submit and implement a stream restoration plan. The three other proposed encroachments are to upgrade failing and undersized stream crossings. Work for this/these encroachment(s) will include excavation, removal of the failing crossings, replacement with new properly sized crossings, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
Cheri Sanville
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
County of Mendocino
Contact Types
Project Applicant

Location

Counties
Mendocino
Other Location Info
The project is located within the Eel River watershed, approximately one mile NE of the town of Laytonville, County of Mendocino, State of California; Section 07, T21N, R14W, Mt. Diablo Base and Meridian, in the Laytonville U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 035-460-01; latitude 39.6939 N and longitude 123.4712W at the point of diversion.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print