Erwin Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0392-R1)

371 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Erwin Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0392-R1)
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2020
Document Description
The project is limited to two encroachments. The two proposed encroachments are to upgrade failing and undersized culverts. The culvert size is to be determined upon pending inspection by a qualified professional. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. Work shall not commence until CDFW has reviewed and approved stream crossing design plans as stated in Sections 2.25 and 3.1 of this Agreement. The Notification discloses additional features of interest. A shallow well exists on the bank of the unnamed tributary to Feliz Creek on APN 047-040-10. This well was previously used for irrigation but is no longer in use. This Agreement does not cover the use of this point of diversion. The Notification also discloses a new well on the property that is used for irrigation. CDFW did not evaluate hydraulic connection of the well to surface water, nor was a hydrogeologic evaluation prepared by a licensed geologist provided for CDFW review.

Contact Information

Name
John Herrera
Agency Name
Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Counties
Mendocino
Parcel #
047-040-10 and 047-050-01
Township
13
Range
12
Section
9
Base
MDB&M
Other Location Info
The project to be completed is located within the Russian River watershed, approximately 3.77 miles NW of the town of Hopland, County of Mendocino, State of California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print