Mastel Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600- 2017-0322-R1)

371 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Mastel Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No. 1600- 2017-0322-R1)
Document Type
NOD - Notice of Determination
Received
Posted
2/28/2020
Document Description
The project is limited to six (6) encroachments. Two (2) encroachments are for water diversion from unnamed tributaries to Salmon Creek. Water is diverted for hydroelectric generation. One (1) encroachment is for repair of hydroelectric generation infrastructure installed on a stream bank. Activities will include operation and maintenance of existing infrastructure, and any work necessary to bring the existing diversion and associated infrastructure into compliance with this Agreement. The three (3) other proposed encroachments are to upgrade failing or undersized culverts on existing roads, and the outlet on an existing pond. Work for these encroachments will include excavation, removal of the culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
Angela Liebenberg
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
County of Mendocino
Contact Types
Project Applicant

Location

Cities
Willits
Counties
Mendocino
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 1 O miles east of the City of Willits, County of Mendocino, State of California. The project is located in Section 10, T18N, R12W, Mt. Diablo Base and Meridian; in the Foster Mountain U.S. Geological Survey 7.5-minute quadrangle.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print