Merker Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-03603-R1)

384 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Merker Water Diversion and Stream Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-03603-R1)
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2020
Document Description
The project is limited to two encroachments (Table 1). One proposed encroachment is to upgrade a failing and undersized culvert. Work for this encroachment will include excavation, removal of the failing culvert, replacement with new properly sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. Work shall not commence until CDFW has reviewed and approved stream crossing design plans as stated in Sections 2.36 and 3.1 of this Agreement. See NOD for Full Details.

Contact Information

Name
John Herrera
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
County of Mendocino
Contact Types
Project Applicant

Location

Cities
Willits
Counties
Mendocino
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 6 miles southeast of the City of Willits, County of Mendocino, State of California. The project is located in Section 36, T18N, R13W, Mt. Diablo Base and Meridian; in the Laughlin Ridge U.S. Geological Survey 7.5-minute quadrangle; Assessor's Parcel Number 105-300-42; latitude 39.3665 N and longitude 123.2582 Wat the first stream crossing (STX-1).

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print