Boggio Stream Crossings Project (Lake or Stream bed Alteration Agreement No. 1600-2019-0591-R1)
384 Documents in Project
Summary
SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Boggio Stream Crossings Project (Lake or Stream bed Alteration Agreement No. 1600-2019-0591-R1)
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2020
Document Description
The project is limited to 6 encroachments (Table 1). Three proposed encroachments are to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of the failingculverts, replacement with new properly
sized culverts, backfilling and compaction of fill, and rock armoring as necessary
to minimize erosion. Two proposed encroachments are to improve existing low water crossings on an ATV trail by installing armored fill crossings. Work for these encroachments will include lower the road, excavating a keyway, placing riprap in the keyway, and rock armoring as necessary to minimize erosion. The final encroachment is to replace a low water crossing with a culvert. Work for this encroachment will include excavation, placement of a new properly sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.
See NOD for Full Details.
Contact Information
Name
John Herrera
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
County of Mendocino
Contact Types
Project Applicant
Location
Counties
Mendocino
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 2.5 miles northwest of the town of Covelo, County of Mendocino, State of California. The project is located in Sections 27 & 34, T23N, R13W, Mt. Diablo Base and Meridian; in the Covelo West U.S. Geological Survey 7.5-minute quadrangle; Assessor's Parcel Numbers 032-540-03, 032-550-04, 032-550-06, 032-550-07, 032-550-08, 032-550-09, 032-560-02, 032-560-03, 032-560-06, 032-570-01 ; latitude 39.8106 N and longitude 123.2910 W at stream crossing 5 (STX-5).
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.