Hosking Stream Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-04825-R1)

371 Documents in Project

Summary

SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Hosking Stream Crossing Project (Lake or Streambed Alteration Agreement No. EPIMS-04825-R1)
Document Type
NOD - Notice of Determination
Received
Posted
12/31/2019
Document Description
The project is limited to one encroachment. The proposed encroachment is to upgrade an existing stream crossing. Work for the encroachment will include removal of decaying logs used to buttress the road fill, removal of an undersized 12" culvert placed within the channel above the crossing inlet, installation of a 5-foot extension to the inlet of the existing 24-inch culvert, backfilling and compaction of fill , and rock armoring as necessary to minimize erosion. All work will be completed when the stream is dry, and no surface water is present. See NOD for Full Details.

Contact Information

Name
John Herrera
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
County of Mendocino
Contact Types
Project Applicant

Location

Counties
Mendocino
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 5.8 miles Southeast of the town of Leggett, County of Mendocino, State of California. The project is located in Section 22, T23N, R16W, Mt. Diablo Base and Meridian; in the Tan Oak Park U.S. Geological Survey 7.5-minute quadrangle; Mendocino County Assessor's Parcel Number 053-470-02 & 012-690-10; approximately latitude 39.8320 N and longitude -123.6132 W at the stream crossing (SC-1).

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print