Schindler Water Extraction and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0136-R1)
384 Documents in Project
Summary
SCH Number
2016112028
Lead Agency
Mendocino County
Document Title
Schindler Water Extraction and Stream Crossings Project (Lake or Streambed Alteration Agreement No. 1600-2018-0136-R1)
Document Type
NOD - Notice of Determination
Received
Posted
9/27/2019
Document Description
The project is limited to six (6) encroachments (Table 1 ). Three encroachments are for water diversion from wells that are hydraulically connected wells to the Eel River. Water is diverted for domestic use and irrigation. This Agreement authorizes water diversion from one well (POD-1), and the Permittee has agreed to not use the other wells. Work for the water diversion will include use and maintenance of the water diversion infrastructure. The other proposed encroachments are to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill , and rock armoring as necessary to minimize erosion.
See NOD for Full Details.
Contact Information
Name
Cheri Sanville
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
County of Mendocino
Contact Types
Project Applicant
Location
Cities
Willits
Counties
Mendocino
Other Location Info
The project to be completed is located within the Eel River watershed, approximately 12 miles east of the town of Willits, County of Mendocino, State of California. The project is located in Section 19, T18N, R11 W, Mt. Diablo Base and Meridian; in the Foster Mountain U.S. Geological Survey 7.5-minute quadrangle; Assessor's Parcel Numbers 171-060-13, 171-060-14, 171-080-01 , 171-070-01 , 171-070-02, 171-070-03; latitude/longitude: 39.4066, -123.1275 at the point of diversion (POD-1) for a hydraulically connected well.
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.