Butte & Ash Creek Bridge Replacement Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016112013
- Lead Agency
- Caltrans 2 (Redding) (California Department of Transportation, District 2)
- Document Title
- Butte & Ash Creek Bridge Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/9/2018
- Present Land Use
- Caltrans ROW
- Document Description
- Approval of Encroachment Permit No. 19226, under California Code Regulations, Title 23, Section 6, for work within an adopted plan of flood control under the CVFPB's jurisdiction, including within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8). The project includes replacement of the existing Ash Creek bridge with a new three span bridge 50 feet long and 44 feet wide.
- Contact Information
-
James Herota
Central Valley Flood Protection Bd.
3310 El Camino Ave. Suite 170
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Coordinates
- 41°11'39"N 120°56'39"W
- Counties
- Modoc
- Cross Streets
- SR 299
- Zip
- 96006
- Total Acres
- 3.5
- Parcel #
- Caltrans ROW
- State Highways
- 299
- Airports
- Adin
- Schools
- Big Valley Primary
- Waterways
- Butte Creek and Ash Creek
- Township
- 39N
- Range
- 9E
- Section
- 21,28
- Other Location Info
- Adin
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Ave., Suite 170, Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.