Chico River Road Trunk Line Installation Project (Capital Project No. 17009)
2 Documents in Project
Summary
SCH Number
2016112009
Lead Agency
City of Chico
Document Title
Chico River Road Trunk Line Installation Project (Capital Project No. 17009)
Document Type
NOD - Notice of Determination
Received
Posted
12/12/2016
Present Land Use
Butte County ROW (Chico River Rd-2 lane arterial)
Document Description
Project consists of the non-capacity increasing replacement of an existing sewer trunk line with approx. 3.4 linear miles of 24 inch sewer trunk line. The project will be located within existing right-of-way and will occur along Chico River Road from the City of Chico Water Pollution Control Plant (WPCP) to Miller Ave., generally located within Butte County jurisdiction. Trenching depths will range from 3-15 feet. Typical facilities to be constructed shall include 24 inch sanitary sewer pipeline and appurtenances; asphaltic slurry seal; installation of pavement markers; striping; and thermoplastic pavement markings. There are no permanent above ground structures associated with the project.
Contact Information
Name
Tracy R. Bettencourt
Agency Name
City of Chico
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Chico
Counties
Butte
Cross Streets
Miller Ave and River Rd
Zip
95928
Total Acres
3.4
State Highways
32
Railways
UPRR
Airports
Ranchaero
Schools
Rosedale ES
Waterways
Sacramento River, Little & Big Chico, Comanchee Creek
Township
21,22N
Range
1E
Section
MULT
Base
MDBM
Notice of Determination
Approving Agency
City of Chico
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.