Eco-Energy Liquid Bulk Receiving Terminal

3 Documents in Project

Summary

SCH Number
2016112007
Lead Agency
Stockton, Port of (Port of Stockton)
Document Title
Eco-Energy Liquid Bulk Receiving Terminal
Document Type
NOD - Notice of Determination
Received
Posted
4/19/2019
Project Applicant
Eco-Energy

Document Description
Eco-Energy is proposing to construct and operate a 10-acre liquid bulk receiving terminal at the Port of Stockton . The Project involves the construction of new rail leads and switches, a rail offload yard, a pipeline, a support building, and a concrete pump station. Liquid bulk petroleum products would be transferred from the Eco-Energy terminal to the adjacent NuStar bulk petroleum terminal through a closed-loop pipeline system. A maximum total of 60 unit trains per year would be received at the proposed facility, resulting in a net increase of 13,500 trucks leaving the NuStar facility annually. Construction of the Project would last approximately 10 to 12 months.

Contact Information
Jason Cashman
Port of Stockton
2201 West Washington Street
Stockton, CA 95203

Phone : (209) 946-0246

Location

Counties
San Joaquin
Other Location Info
630 Port Road 23, Stockton, CA 95203, San Joaquin County

Notice of Determination

Approving Agency
Port of Stockton
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
2201 West Washington Street, Stockton, California 95203

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2016112007   PDF 2359 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print