Southeast Plant Headworks Replacement Project

5 Documents in Project

Summary

SCH Number
2016112006
Lead Agency
City and County of San Francisco
Document Title
Southeast Plant Headworks Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2021
Document Description
The Project includes replacement of two aging facilities with a single headworks facility designed to: improve process performance (higher screenings and grit removal); minimize grit deposition in channels; handle a wide range of flow and load conditions (30 - 250 MGD); provide operational flexibility and reliability; contain odors within plant site; and provide an operation and maintenance friendly facility. Project components include: new influent junction area; new fine screens and screening handlings; new grit removal and grit handling systems; and a two-stage odor control system. Changes to the Project include the following: • Bruce Flynn Pump Station component (improvements) o Upgrade Bruce Flynn Pump Station to enhance reliability in wet weather events, o Modify influent sewer, o No new emergency generator at this location, o Demolish 398 Quint Street building, and o no sewer construction in Evans Avenue, Rankin Street and Davidson Avenue. • SEP 010 Influent Control Structure/Southeast Lift Station component (demolition) o Demolish SEP 010 Influent Control Structure/ Southeast Lift Station Construct new SEP 005 – Southeast Lift Station and associated piping.

Contact Information

Name
Cedric Irving
Agency Name
State Water Resources Control Board
Contact Types
Responsible Agency

Location

Cities
San Francisco
Counties
San Francisco
Regions
San Francisco Bay Area
Other Information
The Project is located in the Bayview District of the City and County of San Francisco, California. It will occur in the northwest corner of the Southeast Plant (SEP) near the intersection of Evans Avenue and Rankin Street, and on the Bruce Flynn Pump Station parcel bordered by Evans Avenue to the south, Quint Street to the east, Rankin Street to the west, and Davidson Avenue to the north.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Francisco
Final Environmental Document Available at
San Francisco Planning Department, 1650 Mission Street, Suite 400, San Francisco, CA 94103, Case File no. 2015-006224ENV

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print