Skyline Elementary School Reconstruction

2 Documents in Project

Summary

SCH Number
2016111055
Lead Agency
Solana Beach Elementary School District
Document Title
Skyline Elementary School Reconstruction
Document Type
NOD - Notice of Determination
Received
Posted
2/10/2017
Present Land Use
LU: Public Institutional; Z: Public/institutional
Document Description
The project would result in the removal of all existing structures and the construction of new facilities. The project would include 33 classrooms and increase Skyline's capacity from 612 to 720 seats. The layout would improve onsite student and bus loading operations and increase onsite parking by 22 stalls. Construction would commence June 2017, and would last 14 months. Existing Skyline programs would be temporarily relocated to Earl Warren Middle School (155 Stevens Ave., Solana Beach) and Solana Highlands ES (5320 Long Run Drive, San Diego).

Contact Information

Name
Caroline J Brown
Agency Name
Solana Beach Elementary School District
Contact Types
Lead/Public Agency

Location

Cities
Solana Beach
Counties
San Diego
Cross Streets
Lomas Santa Fe Dr and Stevens Ave
Zip
92075
Total Acres
9.57
Parcel #
263-421-18
State Highways
5
Railways
Solana Beach Amtrak
Schools
Earl Warren MS, Solana
Waterways
San Elijo Lagoon, Pacific Ocean

Notice of Determination

Approving Agency
Solano Beach School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print