Section 1600 Memorandum of Understanding Renewal for Canal Maintenance and Restoration
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2016111041
- Lead Agency
- Friant Water Authority
- Document Title
- Section 1600 Memorandum of Understanding Renewal for Canal Maintenance and Restoration
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/31/2017
- Present Land Use
- N/A
- Document Description
- The (LSA) Land and Streambed Alteration notification is for the processing of a CDFW Section 1600 MOU for the channel maintenance activities on the improved channels, unimproved channels, leveed channels, drain ditches, and toe-drains and other waters that are intercepted or related to the Friant-Kern Canal. The work areas are specified and described in the Section 1600 binder attached to the Initial Study. The maintenance activities include: (A) Debris or obstruction removal; (B) Silt, sand or sediment removal; (C) Maintenance of channel capacity; (D) Vegetation control: d-1 Mechanical control; d-2 Aquatic vegetation control; d-3 Chemical vegetation control; (E) Repair of existing erosion control work; and (F) Minor erosion control work and revegetation. Mitigation measures for environmental and wildlife protection, erosion control, and water quality are implemented to avoid significant adverse effects and to mitigate impacts to less than significant.
- Contact Information
-
Douglas DeFlitch
Friant Water Users Authority
Lead/Public Agency
854 N. Harvard Avenue
Lindsay, CA 93247-1715
Phone : (559) 562-6305
Location
- Cities
- Bakersfield Fresno Lindsay
- Counties
- Fresno Kern Tulare
- Waterways
- Friant-Kern Canal and channel crossings, waste ways, toe drains
Notice of Determination
- Approving Agency
- FWA Board
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 854 North Harvard Ave., Lindsay, CA 93247
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.