BRLO-5939(070) La Grange Road Bridge Replacement Project (California Endangered Species Act Incidental Take Permit No. 2081-2017-018-04 (ITP))
2 Documents in Project
Summary
SCH Number
2016111033
Lead Agency
Merced County
Document Title
BRLO-5939(070) La Grange Road Bridge Replacement Project (California Endangered Species Act Incidental Take Permit No. 2081-2017-018-04 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2017
Present Land Use
GP: Foothill Pasture; Z: General Ag (A-1)
Document Description
This proposed project involves the replacement of the existing 2-lane bridge on La Grange Road at Dry Creek. The new bridge will be constructed approx. 200 feet west of the existing bridge.
Project will result in impacts to 7.5 acres of CA tiger salamander (Ambystoma californiense) habitat including temporary impacts to 2.9 acres; The project will permanently remove 4.6 acres of CA tiger salamander habitat. The project is expected to result in incidental take of CA tiger salamander, which is designated as a threatened species under the CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project Implementation.
Contact Information
Name
Jim Vang
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Merced
Cross Streets
La Grange Rd over Dry Creek
Zip
95369
Total Acres
36.41
Parcel #
multiple
Waterways
Dry Creek
Township
4S
Range
14E
Section
MULT
Base
Snelling
Other Location Info
Snelling
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No