Pepper Canyon Amphitheater, Public Realm Improvements, Warren Field House Replacement, and Public Art

23 Documents in Project

Summary

SCH Number
2016111019
Lead Agency
University of California San Diego
Document Title
Pepper Canyon Amphitheater, Public Realm Improvements, Warren Field House Replacement, and Public Art
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2020
Document Description
UC San Diego would construct a new 3,000-person capacity amphitheater and associated public realm improvements within the Pepper Canyon Neighborhood, located on the West Campus of UC San Diego. The amphitheater would infill the area between the Visual Arts Facility, Structural and Materials Engineering (SME) Building, the Design and Innovation Building (D&IB), and the planned Pepper Canyon West Student Housing Project. The eastern façade of the Visual Arts Facility would have existing paint removed and would be prepared for the application of a new mural intended to unify and improve the visual quality of the Pepper Canyon Neighborhood. Additionally, UC San Diego would construct the Warren Field House Replacement / Warren Athletic Training Center at the eastern end of Warren Field, adjacent to Gilman Drive. This proposed facility would replace the existing Warren Field House, which is planned for demolition by the San Diego Mid-Coast Transit Constructors (MCTC) to support the planned construction of the Lyman Lane turnaround associated with the Mid-Coast Corridor Transit Project. See NOD for full details.

Contact Information

Name
Alison Buckley
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum #4)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print