Franklin Antonio Hall

24 Documents in Project

Summary

SCH Number
2016111019
Lead Agency
University of California San Diego
Document Title
Franklin Antonio Hall
Document Type
NOD - Notice of Determination
Received
Posted
6/11/2019
Document Description
The proposed project consists of the construction of the Franklin Antonio Hall, comprised of approximately 187,000 gross square feet of collaborative research space in support of research centers associated with the Jacobs School of Engineering. The project will provide shared laboratory centers for collaboration in key research programs with strategic industry partners and research space with faculty offices. The building will also include: space for the Institute for the Global Entrepreneur; education space (general assignment classrooms including a 250-seat auditorium and two 100-seat classrooms, student collaborative study space, and an executive outreach classroom); space for undergraduate student extracurricular projects; shared meeting space; and a cafe.

Contact Information

Name
Alison Buckley
Agency Name
University of California Physical & Environmental Planning
Contact Types
Lead/Public Agency

Name
Agency Name
UC San Diego, La Jolla Campus
Contact Types
Project Applicant

Location

Cities
La Jolla
Counties
San Diego
Cross Streets
UC San Diego, La Jolla Campus

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print