Central Utility Plant Expansion - Chiller Addition

23 Documents in Project

Summary

SCH Number
2016111019
Lead Agency
University of California San Diego
Document Title
Central Utility Plant Expansion - Chiller Addition
Document Type
NOD - Notice of Determination
Received
Posted
2/5/2021
Document Description
The project proposes to expand the existing Central Utility Plant (CUP) with the construction of new, upgraded CUP facilities that would provide approximately 6,000 additional tons of chilled water cooling capacity to the La Jolla Campus. The proposed project would include a building to house two 3,000-ton chillers and associated pumps, controls, and accessories; all electrical distribution equipment; and a telecommunications room and an outdoor utility yard to include two cooling towers. The CUP Expansion facilities would be constructed as a 14,000 gross square foot (GSF), one-story, concrete structure with a basement. The new structure would have a rectangular footprint and would be 52 feet wide in the east–west direction and 165 feet long in the north–south direction. A concrete pad for a future Thermal Energy Storage (TES) tank would also be included. The facilities would also include a restroom.

Contact Information

Name
Alison Buckley
Agency Name
UC San Diego
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Name
Lauren Lievers
Agency Name
UC San Diego
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
La Jolla
Counties
San Diego
Regions
Citywide, Countywide, Southern California
Cross Streets
Gilman Drive and Scholars Drive
Zip
92093
Total Acres
0.2 acres

Notice of Determination

Approving Agency
University of California, San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum No. 6 to 2018 LRDP EIR)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.