Griff Creek Corridor and Public Access Project

3 Documents in Project

Summary

SCH Number
2016102031
Lead Agency
Placer County
Document Title
Griff Creek Corridor and Public Access Project
Document Type
NOD - Notice of Determination
Received

Document Description
The project includes acquisition of the parcels listed above, demolition fo existing improvements, and site stabilization of these properties. An approx. 4,300 sq. f.t automotive shop, associated accessory structures, and approx. 11,000 sq. ft. of impervious surfaces would be removed. Contaminated soils would be remediated if encountered. Best Management Practices (BMPs) would be installed to improve soil function and protect water quality. Site Stabilization would be achieved by installation of on-site storm water BMPs consisting predominantly of enhancing soil moisture retention, revegetating bare soil areas with hydro-mulch and seed mix solution appropriate for this Tahoe Basin site, and performing minor grading to maximize on-site filtration. The site would also be protected from encroachment by vehicles by use of boulders and/or fencing along the perimeters of the property.

Contact Information
Scott K. Cecchi
CA Tahoe Conservancy
1061 Third Street
South Lake Tahoe, CA 91650

530-543-6015

Location

Coordinates
39°14'17.5"N 120°01'52.61"W
Counties
Placer
Cross Streets
Hwy 267, 28
Zip
96143
Total Acres
36
Parcel #
117-180-062, 117-180-059
State Highways
SR 267, 28
Waterways
Lake Tahoe
Township
16N
Range
17E
Section
13
Other Location Info
Kings Beach

Notice of Determination

Approving Agency
CA Tahoe Conservancy
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1061 Third Street, South Lake Tahoe, CA 96150

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A