Honeywell Bay Point Site Interim Measures Project (Streambed Alteration Agreement No. 1600-2015-0231-R3)

3 Documents in Project

Summary

SCH Number
2016102030
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Honeywell Bay Point Site Interim Measures Project (Streambed Alteration Agreement No. 1600-2015-0231-R3)
Document Type
NOD - Notice of Determination
Received
Posted
8/22/2017
Present Land Use
heavy industrial and open space

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0231-R3, pursuant to section 1602 of the Fish and Game Code to Honeywell International, Inc. as represented by Benny Dehghi. Project is limited to improvements to a previously existing berm surrounding a previously existing pond located at the Honeywell, Inc. Project site. Improvements shall include the removal of debris in failing parts of the berm repair of portions of the berm, and construction of a storm outfall structure.

Contact Information
Melissa Farinha
CDFW
7329 Silverado Trail
Napa, CA 94559

Phone : (707) 944-5579

Location

Coordinates
38°2'46.6224"N 121°58'58.5228"W
Counties
Contra Costa
Cross Streets
Port Chicago hwy
Zip
94565
Total Acres
63.3
Parcel #
099-030-027, 028
State Highways
SR 4
Railways
BNSF, UPRR
Schools
Rio Vista ES, Riverview MS, Shore Acres ES, Calvary Temple Chris
Waterways
Suisun Bay
Township
2N
Range
1W
Section
4
Other Location Info
Bay Point

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
7329 Silverado Trail, Napa, CA 94559

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print