Gypsum Pond Removal Action Work Plan - Honeywell Bay Point Site

3 Documents in Project

Summary

SCH Number
2016102030
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Gypsum Pond Removal Action Work Plan - Honeywell Bay Point Site
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2017
Present Land Use
heavy industrial and open space
Document Description
DTSC is proposing to approve a removal action work plan in accordance with California Healthy and Safety Code, Chp 6.8, section 25323.1 and 25356.1(h) for the Gypsium Pond Honeywell Bay Point site. The RAW outlines interim actions to control surface water accumulation and bird use in the former gypsium stockpile area at the site. The Gypsium Pond will be dried using a combination of stormwater drainage control improvements and restoration of the eastern berm that separates the Gypsum Pond from the adjacent tidal marsh. Once the primary sources of water inflow into the Gymsum Pond are eliminated, the high evaporation capacity of the area will dry the Gypsum Pond and eliminate the potential exposure to ecological receptors from any potential metals that exceed ecological protection levels in the Gypsum Pond water. The project components in the removal action include berm restoration, stormwater drainage control improvements, and installation and operation of a bird deterrence system. The Gypsum Pond management is part fo the on-going environmental investigation and remediation program being conducted at the Site. If approved, the RAW would prepare the project area for a Site-wide soil remedy by controlling the surface water accumulation within the Former Gypsum Stockpile Area and prevent exposure of birds to concentrations fo metals that are above ecological protection levels.

Contact Information

Name
Daniel Murphy
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Counties
Contra Costa
Cross Streets
Port Chicago hwy
Zip
94565
Total Acres
63.3
Parcel #
099-030-027, 028
State Highways
SR 4
Railways
BNSF, UPRR
Schools
Rio Vista ES, Riverview MS, Shore Acres ES, Calvary Temple Chris
Waterways
Suisun Bay
Township
2N
Range
1W
Section
4
Other Location Info
Bay Point

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print