Santa Ana River Conservation and Conjunctive Use Project (SARCCUP) Joint Projects

8 Documents in Project

Summary

SCH Number
2016101079
Lead Agency
Inland Empire Utilities Agency
Document Title
Santa Ana River Conservation and Conjunctive Use Project (SARCCUP) Joint Projects
Document Type
NOD - Notice of Determination
Received
Posted
3/21/2019
Document Description
The SARCCUP is a watershed-scale collaborative program that has been developed to Improve the Santa Ana River watershed's water supply resiliency. This collaborative program includes implementing multiple projects that would manage surface water and groundwater to improve the overall reliability of water supply in the watershed, The proposed Project Includes the implementation of five specific projects (Joint Projects) that are located within the Santa Ana River Watershed. The five specific projects would assist in achieving the objectives of SARCCUP. On October 28, 2018, Inland Empire Utilities Agency (IEUA), as lead agency, issued a Notice of Preparation stating that it would be preparing an EIR to study the Project's potential Impacts, if any, to the environment. !EVA issued and publicly circulated for review, a Draft EIR for the Project in November 2018, and certified the Final EIR for the Project on February 20, 2019, The Final EIR concluded that the Project would not cause any potentially significant effects to the environment. At a noticed public meeting held on March 20, 2019, WMWD considered the Project, and the environmental effects of which were studied in the Final EIR. At that meeting, WMWD approved the Project in its limited capacity as a responsible agency, and adopted Resolution No. 3062.

Contact Information

Name
Jason Pivovaroff
Agency Name
WMWD
Contact Types
Lead/Public Agency

Location

Counties
Orange, Riverside, San Bernardino

Notice of Determination

Approving Agency
WMWD
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print