PHG16-0014, ENV 16-0009 - Membrane Filtration/Reverse Osmosis Facility (MF/RO)

3 Documents in Project

Summary

SCH Number
2016101073
Lead Agency
City of Escondido
Document Title
PHG16-0014, ENV 16-0009 - Membrane Filtration/Reverse Osmosis Facility (MF/RO)
Document Type
NOD - Notice of Determination
Received
Posted
2/15/2017
Present Land Use
undeveloped, general commercial, general commercial mixed use overlay
Document Description
Project involves a CUP for the development of a Membrane Filtration/Reverse Osmosis facility (MF/RO) designed to provide advanced treatment for recycled water produced at the City of Escondido's Hale Ave Resource Recovery Facility (HARRF) for agricultural uses. Utility projects, including processing, storage, and distribution facility for water are permitted uses within commercial zones, subject to the approval of a CUP. The proposed MF/RO would utilize membrane filtration (i.e., microfiltration (MF) or ultrafiltration (UF) membranes] and reverse osmosis (RO) technologies sized for a total production capacity of 2.0 million gallons per day (mgd) with the ability to accommodate the installation of future equipment to provide an additional 1.0 mgd of production capacity. The proposed project would consist of two buildings, both with a maximum height of approx. 31'. The MF/RO Process Building (21,729 SF) would house the MF/RO equipment, pumps, electrical rooms, control rooms, and meeting rooms. The Chemical Building (14,115 SF) would house the transfer pumps and accommodate the storage of chemical used in treatment process. The project also includes several above ground storage tanks with a maximum height of 30' (300,000 gal influent tank, 160,000 gal inter-process tank, and 820,000 gal product storage tank), and a 1,500 kW emergency backup generator, as well as various above and below ground pipes and support infrastructure. The perimeter of the sit would be secured by a combination of new six-foot-high masonry walls and decorative wrought iron fencing. Access would be provided via two driveways on E. Washington Ave. A limited number of employees would visit the site for daily inspections (as needed), monthly routine facility maintenance, and delivery and removal of chemicals.

Contact Information

Name
Adam Finestone
Agency Name
City of Escondido
Contact Types
Lead/Public Agency

Location

Cities
Anderson, Escondido
Counties
Shasta
Cross Streets
1201 East Washington Ave and North Ash Ave
Zip
92025
Total Acres
4.50
Parcel #
2301410100
State Highways
15, 78
Schools
Mission MS
Waterways
Escondido Creek
Township
12S
Range
2W
Base
SBBM

Notice of Determination

Approving Agency
City of Escondido City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes