CTF Wind Energy Generation Project

3 Documents in Project

Summary

SCH Number
2016101069
Lead Agency
Department of General Services (DGS)
Document Title
CTF Wind Energy Generation Project
Document Type
NOD - Notice of Determination
Received
Posted
7/27/2017
Present Land Use
Correctional facility
Document Description
DGS proposes to construct and operate a 1.79 MW electricity wind turbine at the CTF with the purpose of offsetting electricity usage required by prison facility operations at SVSP and CTF. The proposed wind turbine is a GE Energy 1.79 MW-100m turbine. This model is a three-bladed, upwind, horizontal-axis wind turbine with a rotor radius of 165 feet (50.29 meters). The turbine rotor and nacelle are mounted on top of a tubular steel tower, giving a rotor hub height of 262 feet (80 meters), for a total structural height of up to 427 feet (130.15 meters). The machine employs active yaw control (designed to steer the machine with respect to the wind direction), and can operate at variable speeds using active blade pitch control (designed to regulate turbine rotor speed). The turbine uses a doubly fed asynchronous generator with a partial power conversion system (designed to produce nominal 60 Hz, 690 volt electric power. The main shaft bearing is a roller bearing mounted in a pillow-block housing arrangement. The bearings used inside the gearbox are of the cylindrical, spherical, and tapered roller type. These bearings are designed to provide bearing and alignment of the internal gearing shafts and accommodate radial and axial loads.

Contact Information

Name
Jennifer Parson
Agency Name
Department of General Services
Contact Types
Lead/Public Agency

Location

Cities
Soledad
Counties
Monterey
Zip
93960
Parcel #
257-082-018-0000
State Highways
101

Notice of Determination

Approving Agency
DGS
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print