Southern California Edison Transmission Tower Replacement Project Harbor Development Permit No. 16-025

5 Documents in Project

Summary

SCH Number
2016101061
Lead Agency
Port of Long Beach
Document Title
Southern California Edison Transmission Tower Replacement Project Harbor Development Permit No. 16-025
Document Type
NOD - Notice of Determination
Received
Posted
5/28/2020
Document Description
An addendum to the Southern California Edison Transmission Tower Replacement Project (Project) Final EIR certified by the Long Beach Board of Harbor Commissioners in December 2017 has been prepared to evaluate minor technical modifications to the approved project proposed by Southern California Edison Company, comprised of: (1) Addition of ground improvements to the driven pile foundation design for the new towers M0-T2X (Pier S) and M0-T3X (Pier B) to combat the effect of lateral spreading and allow driven piles to be viable at all locations. (2) A modification to Mitigation Measure BIO-4 to allow no more than 5 percent permanent loss of Southern Tarplant associated with construction activities, such as crushing by construction equipment, vehicles, or foot traffic. This 5 percent permanent loss is in addition to the no more than 10 percent temporary impacts of the on-site population on the south side of the Cerritos Channel. In addition, a correction is made to Section 3.2.5.1 of the Final EIR to reflect the appropriate language in Special Condition 6.3.2.1 in Chapter 6 of the Application Summary Report. Text in the Final EIR Section 3.2.5.1 indicates that "removal of transmission towers would be completed outside of the nesting season (approximately February through August)". This text would be stricken as it is inconsistent with the correct language in Special Condition 6.3.2.1 in the Application Summary Report. Special Condition 6.3.2.1 does not preclude tower removal or construction during bird nesting season if the measures identified in the Special Condition are followed.

Contact Information

Name
Alex Holford
Agency Name
Port of Long Beach
Contact Types
Lead/Public Agency

Name
Agency Name
Southern California Edison Company
Contact Types
Project Applicant

Location

Cities
Long Beach
Counties
Los Angeles
Other Location Info
Port of Long Beach Cerritos Channel Crossing, near Carrack Avenue and Pier A Way in the City of Long Beach, California; County of Los Angeles

Notice of Determination

Approving Agency
City of Long Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print