Mitigated Negative Delcaration (MDN 02-16) for the Alamitos of Generating Station Battery Enegy Storage System
4 Documents in Project
Summary
SCH Number
2016101035
Lead Agency
City of Long Beach
Document Title
Mitigated Negative Delcaration (MDN 02-16) for the Alamitos of Generating Station Battery Enegy Storage System
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2017
Present Land Use
Designated "LUD No. 7; mixed uses" and zoned "planned development district 1 (PD-1), Sub area 19" (SEADIP)
Document Description
AES Southland Energy, LLC proposes to construct a 300 megawatt battery energy system (BESS) facility at the existing Alamitos Generating Station. The BESS would consist of three 50-foot high buildings and would be constructed within an existing surface parking lot on the generating station property. The project would include ancillary facilities such as a chiller plant (utilized as a cooling system for BESS facilities) and necessary utility connections. Project would also include parking, landscaping, and open space improvements in various portions of the above of the generating station line.
Contact Information
Name
Craig Chalfant
Agency Name
City of Long Beach
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Long Beach
Counties
Los Angeles
Cross Streets
North Studebaker Rd and East 7th St
Zip
90803
Total Acres
71.42
Parcel #
7237-018-808, 019-808
State Highways
SR 22, I 405, I 605
Airports
Long Beach
Schools
Multiple
Waterways
Los Cerritos Channel & San Gabriel River
Township
5S
Range
12W
Section
2
Base
SBBM
Notice of Determination
Approving Agency
Long Beach Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes