Corrective Action Final Remedy for the Univar USA, Inc. Facility

2 Documents in Project

Summary

SCH Number
2016101028
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Corrective Action Final Remedy for the Univar USA, Inc. Facility
Document Type
NOD - Notice of Determination
Received
Posted
1/13/2017
Present Land Use
commercial/industrial

Document Description
The project involves selecting the final corrective action remedy to address releases of chemicals to the subsurface at the former Univar USA, Inc. site. The proposed remedy involves on-site soil vapor extraction, on-site groundwater extraction, off-site groundwater extraction, monitored natural attenuation for groundwater once active treatment ends, and on-site land use restrictions. The proposed remedy is discussed in greater detail in the CEQA initial study and other project documents including the corrective measures study report and DTSC's draft statement of basis.

Contact Information
Ryan Batty
Department of Toxic Substances Control
8800 Cal Center Drive
Sacramento, CA 95826-3000

Phone : (916) 255-6424

Location

Coordinates
34°00'45.44"N 118°10'53.83"W
Cities
Commerce Vernon
Counties
Los Angeles
Cross Streets
Noakes St an S. Bonnie Beach Place
Zip
90023
Total Acres
9.5
Parcel #
5242-018-002, -024-009
State Highways
I 5, I 710
Railways
UP and BNSF Hobart
Schools
Eastman Ave ES
Waterways
LA River
Township
2S
Range
12W
Section
07
Base
LA

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
8800 Cal Center Drive, Sacramento, CA 95826

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search