Addendum to Cal Poly Master Plan EIR - Student Housing Program
6 Documents in Project
Summary
SCH Number
2016101003
Lead Agency
California State University Board of Trustees
Document Title
Addendum to Cal Poly Master Plan EIR - Student Housing Program
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2024
Document Description
The previously anticipated project under the Cal Poly Master Plan and evaluated in the Campus Master Plan EIR included the development of nine new on-campus residence halls of up to five stories in height. Following refinements in design and planning, the project now proposes the same number of buildings and building heights of up to nine stories. Internal circulation (roadways, bicycle paths, and walkways) would be provided as part of site design. The project also involves the demolition of five smaller student housing buildings that provide less than 70 student beds each in order to accommodate the more efficient, denser housing development. The project would provide up to 4,500 new student beds, for a net increase of 4,155 new student beds on the main campus.
As part of the same project and similar to the original project analyzed in the Campus Master Plan EIR, the existing Red Bricks student housing facilities (Trinity Hall, Muir Hall, Fremont Hall, Tenaya Hall, Sequoia Hall, and Santa Lucia Hall) would be renovated to provide more modern, efficient student housing accommodations. This requires the potential removal of the Hillcrest building, which is located within the project site adjacent to Trinity Hall and Santa Lucia Hall. The existing University Housing building that is also located within the project site would not be modified as part of the project.
Contact Information
Name
Scott Bloom
Agency Name
Trustees of the California State University
Job Title
Campus Planner
Contact Types
Lead/Public Agency / Project Applicant
Address
Phone
Email
Location
Counties
San Luis Obispo
Regions
Southern California
Cross Streets
Grand Avenue, California Boulevard
Zip
93407
Total Acres
26
State Highways
US 101, SR 1
Railways
Amtrak Coast Line
Waterways
Stenner Creek, Brizzolara Creek
Notice of Determination
Approving Agency
California State University Board of Trustees
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.